We found 847 adverts for you in 'gardening tools and equipment', in the UK and Ireland
Top Searches:
This advert is located in and around Rhyl, Denbigshire
Gtech hedge trimmer for spares adjustable length was working last year but now it will not take a charge so up for spares
14 hours ago
This advert is located in and around Colchester, Essex
Garden Custom Made Wooden Tool, Cushion, Blanket Storage Deck Box Made with exterior trade grade pressure treated UC4 timber Measurements 125 cm Wide 64 cm Deep 64 cm High at Front 74 cm...
15 hours ago
This advert is located in and around Rhosgoch, Anglesey
small buggy type ride on mower for spares /repairs. starts and runs fine but cutting deck needs attention and can not engage reverse gear.
5 days ago
This advert is located in and around Shrewsbury, Shropshire
New Castle garden 40 inch 102 this is the deck that has plastic deflector in the bottom of the shoot. With two bolts about 2008 to 2012 fits many models cost me £340 no longer needed.
8 days ago
This advert is located in and around Carnforth, Lancashire
This Mountfield lawnmower is Approx 10 years old. It's a petrol mower and has been reliable with just a petrol hose replacing and spark plug cleaning. It has a gear shift where it will drag you up small...
19 hours ago
This advert is located in and around Congleton, Cheshire
LPG Space Heater 34,000 BTU Mains Powered. Connect to LPG bottle Ignition system included Regulator included Perfect to warm the Gazebo or outside Buildings. Used just once Selling as emigrating...
1 day ago
This advert is located in and around Burnham Green, Hertfordshire
Three netting tunnels complete with wire hoops for fixing, protects crops from bird/pest damage. In good condition.
7 hours ago
This advert is located in and around Winsford, Cheshire
Rally ride on lawnmower 38 inch cut, electric start, spares or repair, it's been working fine for as long as I've owned it cut well sometimes awkward to get out of gear when running after I adjusted...
10 hours ago
This advert is located in and around Bristol
Extendable Hedge Trimmer (electric) Ryobi RPT400, ideal for cutting back tall hedges or shrubs, a good addition to your gardening tools. In good working order.
13 hours ago
This advert is located in and around Chichester, West Sussex
Electric Apple Mill. Simply feed your apples or other fruits into the hopper and the blades will mill them for you. Grab a bargain in readyness for Harvest! Cash on collection Buyer collect only
This is a 19mm bore yellow garden hose, 25m length and includes nozzle and tap connection adaptor ( for standard 3/4” BSP). As good as new as hardly used. It is a heavy weight section so extremely...
20 hours ago
This advert is located in and around Hinckley, Leicestershire
Qualcast Suffolk Punch 35s self-propelled petrol cylinder lawnmower, with grass box. This small push lawnmower has adjustable height, self-drive, cable start, cutting height settings and a grass...
This advert is located in and around Ipswich, Suffolk
Pick axe head (requires a handle). At least 30 years old, not had much use, these don't tend to wear out much! Collection only, East Ipswich.
This advert is located in and around Swansea, West Glamorgan
Heavy duty knee pads never used new, ideal for gardening , detectoring or anything you need to bend on your knees extra if postage required £3.
This advert is located in and around Bridgend, Mid Glamorgan
Apple masher plus apple press for apple juice or cider making. Manufactured by Vigo. Cost originally approximately £200. Used very little and therefore in good condition.
This advert is located in and around Christchurch, Dorset
Mountfield MHT 20 Li freedom100 battery powered hedge trimmer Equipped with a 70cm hardened steel laser cut blade and a working time of up to 40 mins, the MHT 20 Li. Only used twice battery went missing...
2 days ago
This advert is located in and around Weston Super Mare, Somerset
Only used a few times and carefully stored in a garage. Ideal for drive/patio/decking etc. With all accessories and instructions Collect from Milton, Weston super Mare or can deliver locally
This advert is located in and around Annan, Dumfries And Galloway
Garden lawn roller for sale can be filled with sand or water, easy to move around when empty if needed. COLLECTION ONLY
This advert is located in and around Cross Hands, Carmarthenshire
Measures approximately 23 inches long and 16 inches wide. Would be suitable to use as a planter or a dog bath.
This advert is located in and around Sandbach, Cheshire
50 metre hozelock hose. No fittings. Message for any further information or photos. Used a few times but still in good condition. Collect in person only.
3 days ago
You are currently on search results page 1 of 43